AC is determined by checking group and checking rule
Checking Group = A check+ Total Sales + Total Dlv Requirement + Block QtyRq + No Check + Accum
Av Check is defined in MRP3 in Material Master (Discussed below)
Total Sales = Single Records or Total Records per day or Total records per week
Total Dlv Rqs = Single Records or Total Records per day or Total records per week
Block QtyRq = This block is used if several users are able to process the material simultaneously in different transactions without blocking each other.
No Check = This indicator switches off the availability check according to ATP logic for the checking group concerned
Schedule Line and Requirement Type is determined by Item category and MRP Type
Following are the relevant fields required from Material Master to run Availability Check.
MRP1
MRP Type –PD
VB - We have to define, re-order point, safety stock etc. In manual reorder point, you must define the reorder point (and eventually the safety stock) according to your criteria. For automatic, these values are estimated by SAP as a function of the forecast (coming from historical data), so the base-quantities for the calculation of the reorder are not fixed but dynamic.
Lot Size – 10
MRP 3
Strategy Group-
10 – Make to Stock
20 – Make to Order
70 – Planning at Assembly Level
30 – Production only with Sales order (Demand Management entry ignored during MRP run)
Availability Check
1 Daily Requirement
2 Individual Requirement
3 Rep- Lead Time
4 Current Stock
KP No Check
Sales/General Plant
A/Check Availability check field (on the MRP screen and the Sales: General/Plant screen) so that you can perform an availability check with replenishment lead times (01 in the standard system).Item category group (for example, NORM) on the Sales organization screen
Monday, November 9, 2009
Subscribe to:
Post Comments (Atom)
Archives
-
▼
2009
(359)
-
▼
November
(115)
- Supplementary Invoice in SD SAP
- Cin /excise invoice in sales and distribution
- Assign Invoice List Type to Billing Type
- Important Tips for Interview for SAP SD
- SAP SD Interview Questions
- Interview Question and Answers on SAP SD
- Some SAP SD Interview Questions I
- Some SAP SD Interview Questions II
- SAP Sales and Distribution Frequently Asked Question
- Link Between SAP SD, MM & FI
- Why Do We Assign Division to Sales Organisation
- SAP SD resume
- SAP SD Interview tips and tricks
- Basic Process of how Packing Works
- The "Packing Process" with an Example
- SAP SD Deleted deliveries
- SAP SD Consolidation route and delivery routes
- Define SD Tax condition type
- Customizing Customer Hierarchy in SD
- How sales document is structured?
- SAP SD Customer Groups
- SAP SD Picking of Goods
- Creating a Sales Document in SAP R/3
- Line item: SD Header information is missing
- SAP SD ALE distribution model for customers master
- SAP SD Define Incompleteness procedures
- SAP SD Partner determination and control
- SAP SD Enterprise structure
- SAP SD Credit Management How To Do Configuration F...
- SAP SD Credit Management MRP block for Credit limi...
- SAP SD Credit Management Credit Mgmt Dynamic checking
- SAP SD Credit Management Difference Between Simple...
- SAP SD Credit Management Sales value field in not ...
- SAP SD Credit Management Set Up for Credit Card Pa...
- SD Credit Management Dunning Process In Credit Man...
- SD Dunning Process In Credit Management
- The "SD Packing Process" with an Example
- Sales Order Management Transactions
- SD Display/change data in credit management
- SD Configuration For Credit Management
- SAP SD Variant Configuration
- SD Customer hierarchy
- What is purpose of maintaining common SD distribut...
- What is the difference between SD ERB and ERU acco...
- SD What and where types of copy controls we change
- Line item: SD incorrect account information in header
- SD Line item: branch items missing
- What is meant by transfer of data from legacy code
- Steps to transport a SD Configuration Request
- Free SD EDI Configuration guide
- SD Define Rule for Date Determination
- Define SD Scheduling by Sales Document Type
- SD Configuring Pricing Control
- Define Reasons for SD Rejection
- Define SD Sales Document Types
- SD Pricing Procedure Configuration
- SAP SD Data Migration
- SAP SD CIN Configuration
- CIN /excise invoice in sales and distribution
- CIN-FI Entries
- Apply support package for CIN version ECC 5.0
- SAP 4.6C : SAINT: CIN
- Export Billing Configuration with CIN and Foreign ...
- Regarding fileds in CIN
- SAP SD CIN Issues
- SAP SD Billing cannot be Release to Accounting
- SAP SD Princing Default Start Variant for VF04
- SAP SD Billing Condition Exclusion which will be d...
- SAP SD Billing Steps for creating a new or changin...
- SD Billing Block will not worked if you did not as...
- SAP SD Billing Plan for Milestone Billing
- SAP SD Billing - Combine Billing for deliveries wi...
- SD Billing Spilt by Item Category
- SAP SD Billing Maximum number of items in FI reach...
- SAP SD Billing Prepaid process possible
- SD Billing Restricting Number Of Items In Billing Doc
- M/SD: automatic transfer of cancellation billing d...
- What are the Steps for the End-user Training in SA...
- User-Exits in the SD In- and Outbound Processing o...
- FREE SAP SD GOODS
- SAP SD Intercompany Sales Processing & Billing
- The SD Delivery Process
- If we dont give the horizan period in dynamic SD c...
- SD Billing and Material Determination
- SAP out abt SD and MM ISSUES
- Availability Check on Quotation
- SD material Determination based on availability check
- Creating Multiple Materials in Material Determination
- Backward and Forward Scheduling
- Issue free goods to selected Customers
- SD Availability check
- Avaialbility check 01 (Daily requirement) and 02 (...
- SD Availability Check
- Settlement Downpayment with Installment payment Term
- SD What r the 5 imp fields to be maintained in a/c...
- Special Processing Indicator
- Sales and Distribution - Upload Condition Pricing
- Sales Order Changed History Display
- SAP SD Reports
- SD Questions on Corporate Structure
-
▼
November
(115)
No comments:
Post a Comment