Powered By

Free XML Skins for Blogger

Powered by Blogger

Monday, November 9, 2009

Creating Multiple Materials in Material Determination

Material Determination is used to swap one material for another.It is possible to get a list of materials for substituiton,but remember you can substitue only one material from the list.

This can be done through substituiton reason T Code [OVRQ]
See the substitution reason number for Manual Material Selection
- check the Entry box
- check the Warning box
- select A for Stategy
- save.

Go To VB11 to create Material Determination (taking into consideration that all the previous steps for material determiantion i.e. maintaining condition types,maintaining procedures for material determination and assigning procedures to sales doc. types have been done)

Create one material determination,dont forget to give the Subst reason on top and also on the line.

Click the Variants Icon on top left-Sreen opens

Specify different materials you want to swap with the material you have enterd

Note that the subst reason is already copied on the screen

Remember materials should be of the same sales area,atleast Divisions should be same.

No comments:

Archives