Can you tell me the necessary settings required for a meterial Inspection - Purchased as raw material, where some MICs are checked with every lot and some are checked once a month. In a month there could be one lot or several lots (10 or 20 or 0 etc.)
With best regards,
Sukhbir P Mittal
You create necessary MICS. Then assign MICS to Inspn plan in QP01.
For those MICS which need inspn every lot (critical characs chk),do not enter a dyn mod rule.
For those that need skip type inspn,say inspect first lot , if ok then skip rest 29 lots (Asumption 1 lot per day,so 30 lots a
month)-for this u need to create rule using QDR1. & assign the rule into the specific MIC in the inpn plan charac over view.
Also plan header need to be populated for dyn mod level at charac level & rule.
Pl. try this out & let us know.
No comments:
Post a Comment